Test point installed across coil.
Fan coil unit installation checklist.
Download method statement for installation of fan coil units fcu s download package contains the method statement checklist for installation inspection testing plan r isk assessment.
Ensure that the units are installed correctly undamaged.
Fix the standard unit to the ceiling or wall using at least 4 of the 6 slots.
Ensure that all units sections are thoroughly clean and free from installation debris.
Cdv vertical high performance fan coil unit fan coil relay board fcrb installation operation and maintenance fan relay board 2 frbii installation operation and maintenance.
Adrian aw created date.
Attach coil to casing flange using coil mounting screw pre viously removed.
Ensure that all access panels and blanking plates are in position and are secured.
Hvac systems are a technical and critical part of any inspection it is important to understand and inspect the hvac components as a system.
Complete the following checklist before installing the unit and com plete the installation checklist on page 7 to ensure proper and safe operation.
Ensure that the filters are free from dust.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant clients.
The units must still be handled with great care and no force or pressure applied to the coil or piping.
Clearances allow adequate space for free air circulation service clearances piping and electrical connections and any necessary ductwork.
Variable air volume units 52 54 variable air volume air handling unit 1 55 57 packaged air cooled chiller 58 59 air cooled condensing unit and dx fan coil 60 61 hot water boiler 62 63 hvac system controls 64 65.
Horizontal fan coils installation mounting instructions installation price fan coils are designed to be durable and manufactured for sturdy construction.
N for horizontal installation ceiling mounting it is advisable to use m8 thre aded bars screw anchors suitable for the unit s weight and to arrange for the positioning of the unit using 2 m8 bolts and a washer the diameter of which is suitable for inserting the slot and for then fixing the unit.
The hvac components not only supply heating and cooling to the house but they are also a critical part of the health of the home.
Pre commissioning procedure for fan coil units.
For specific unit dimensions refer to the submittals.
Make sure the pan cap in the fitting door is properly seated on the fitting door to retain the low air leak rating of the unit.
Pre commissioning checklist unit check visual inspection no apparent damage fan coil unit system item task yes no n a.