At this video i would like to share with you one method of flooring vinyl plank replacement.
Fill seam subfloor vinyl plank.
If you re installing sheet vinyl or peel and stick tiles you also want to fill knots that you would be able to feel under the flooring.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
Floor filler is a type of portland cement mortar much like the material used to fill any voids in an existing floor.
Repair howto vinyl hello my friends.
Seal in the edges so no air can escape.
Take 4 flashlights turn them on and put them over the holes.
Feather the edges of the patch to blend with the surrounding concrete.
Get some 1 8 hardboard lauan or birch plywood one side smooth and lay it down without gaps over the sub floor.
Allow the patch to dry.
Fill low spots on the floor with patching compound applied with a putty knife.
This filler is more flexible however and moves with the vinyl flooring as you.
Go down to your basement and find the lights shining down.
Take out your sawzall and cut the side that has the lip and to the two corners to make a u shape.
If you have this problem then you may be wondering what you can do both to improve the look of your vinyl plank flooring and also to fill in gaps that can allow cold to enter from the subfloor.
Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
An effective strategy for filling large gaps is to mix patching compound to a stiff mortar like consistency trowel it into the plywood subfloor gaps and wait for it to stiffen before troweling it smooth.
If it is easy to pull up your subfloor has too much moisture for vinyl.
Smooth any edges fill any gaps.
Another way to measure the moisture in a concrete subfloor is to tape a piece of your scrap vinyl to the floor using duct tape.