Step 1 prepare.
Flashing a window before vinyl siding.
Beveled siding creates a sloped sill.
Overlap the flashing onto the row of siding just below the window.
Ensure that the flashing along the bottom of the window overlaps the nailing hem of the last complete course of siding beneath the window.
After wrapping the opening we nail a piece of siding along the rough sill with 13 4 in.
Window flashing is installed at the same time as the window unit.
The second half of window flashing occurs once the window unit is secured and squared within the rough.
Inspect the flashing and building wrap around the window.
If the window s deep in an entryway and has zero exposure you can skip the weatherproofing and just caulk around it.
Self adhesive flashing tape goes on next.
Now any water that runs inside the j channels will come out on top of the siding and out the weep holes designed for this purpose.
Cut a piece of flashing out of felt paper and install it at the bottom corners of the windows before you install the side j channels.
For a wood window unit drip cap flashing can be installed over the trim piece often called brick molding that comes.
Be sure to add the thickness of the siding to the window s height when framing the rough opening.
Before the siding itself can be hung a number of accessories must be installed first including starter strips corner posts window flashing trim and j channels over the roof lines and around openings.
Follow these simple steps to help the installation process go smoothly.
Protect your windows vinyl siding with flashing.
Prepare windows and install accessories.
If you have vinyl or metal flanged windows for instance you can install drip cap flashing 4 the home depot over the window itself or over the top trim piece that you install.
The type and location of the flashings will vary depending on the type of windows and doors.
Speak with someone in the building department in your town to make sure the flashing on the windows with vinyl siding is up to code you will also want to try as best as you can to plan this project during a two to three day period where rain or snow is not.