For the promised features and the effect of the flexidry f0 formula.
Flexidry floor screed.
This would normally mean that a 75mm standard screed application would take 110 days at 20c to receive a sensitive final floor finishings and this is something that is quite often overlooked.
Testing of the screed moisture testing.
Please check out the similar products section for alternatives.
An advanced and highly adaptive fast drying screed additive flexidry is an advanced and highly adaptive screed system which can be used on a wide range of floor applications.
Having already been used successfully in thousands of projects across europe flexidry is a cost effective accelerated screed system which can be used on a wide range of floor applications giving a choice of dry times of 7 14 or 21 days.
Flexidry global ltd hasn t formatted technical specifications for flexidry floor screeds yet.
Standard floor screed dries at a rate of 1mm per day up to 40mm and 0 5mm per day thereafter.
Floor screeding the essential guide to floor screeding last updated 03 feb 2013 csc screeding.
In 2008 flexidry global limited launched a floor screed additive into the uk market which dramatically reduces drying times.
U sed successfully in thousands of projects throughout europe flexidry is a low concentrated liquid additive that is simply added to a cementitious screed mix on site.
The various flexidry fast drying floor screeds include flexidry f0 with a drying time of just 3 days flexidry f1 which dries in 7 days flexidry f2 which takes 14 days and flexidry f3 which takes 21 days to dry.
Flexidry is an accelerated screed additive which can be used on a wide range of floor applications.
All these screeds make it possible to let light foot traffic proceed within 12 hours of installation.
Products with have technical specifications.
Flexidry a floor screed additive that dramatically reduces drying times.
The recognised testing method for flexidry floor screeds is a carbide bomb test which should always be carried out before laying sensitive floor coverings.
Why wait 110 days for your floor screed to dry when you can choose 3 7 14 or 21 days.